BY Randall Zajac Download PDF version of this article
![]() |
| Appledore IV makes her way upriver after a cruise on the Saginaw Bay with her restored topmasts in place. |
The main topmast had a bad section of rot near the bottom that would need to be replaced with solid wood. The fore topmast was much worse. It had an entire board in the middle that was rotted and would have to be cut apart to be repaired.
| Figure 1—A pocket knife points to the signs of rotten wood in the fore topmast. |
|
| Figure 2—Once the mast was split open, the full extent of the rotted area was revealed. |
|
The splitting of the fore topmast involved several procedures. The first step was to use a circular saw along a batten that was nailed in place to make four cuts (two on either side of the topmast) at full depth to get the split started. A handsaw and a Sawzall™ were used to cut a bit deeper with the circular saw cuts as a guide. Wedges were then used to force any wood that was still intact apart (Figure 2).
Once the mast was split open, we decided that it would be better to scrap the smaller of the halves and build up the larger side. A power planer was used to get what was left of the mast down to a flat surface.
The next step was to cut the pieces of Sitka spruce that were going to build the topmast back to its original shape. The mast needed to remain hollow so the first layer was two pieces of 2½"×1"×24' glued along the edges (Figure 3). All repairs were done with WEST SYSTEM® 105/206 and 404 High-Density Filler.
![]() |
| Figure 3—A 1"×2½" piece of Sitka spruce was glued to each side of the cleaned-up fore topmast half to reproduce a hollow area in the center. |
![]() |
![]() |
| Figure 4—A 2"×8"×24' cap was clamped with metal banding tightened by driving wedges under the bands. |
Figure 5—A spar-making jig is used to lay out the flats of an octagon on a square, tapered spar. The lines are guides for planing the corners. |
Once the epoxy was cured and the clamps were removed, the repair area was cut down with a power planer to match the original taper of the topmast. A spar-making jig was used to lay out the flats of an octagon on the squared portion of the topmast (Figure 5).
These lines were used as guides for planing off excess stock.
There are two dowels on the jig that drag along the outside of the spar. Two pencils are spaced on the jig to mark the edges of an octagon flat. As the jig moves down the tapered spar, the jig is turned so that both dowels stay in contact with the sides. The spacing of the guide lines gets narrower in proportion with 3the narrowing width of the spar. To make a spar-making jig, space the dowels at the biggest diameter of the spar. To find your pencil spacing, multiply the largest radius of the spar by .8284 (radius × .8284) (Figure 6).
![]() |
| Figure 6—Dimensions of a spar-making jig. |
![]() |
![]() |
| Figure 7—A circular saw, chisels, and a rabbet plane were used to excavate rot in the main topmast. |
Figure 8—The excavation was prepared to receive a custom Sitka spruce Dutchman. |
![]() |
![]() |
| Figure 9—Bill Bauer finish sands a mast. A sanding belt was placed on a drill with a rubber drum to get the final rounding. |
Figure 10—The repaired masts received 2 coats of 105/206 followed be a couple of coats of paint. |
Reprinted from EPOXYWORK Number 24, Fall 2006. Gougeon Brothers, Inc. All rights reserved.